Loading

Report as inappropriate

Absolutely.
Lets assume you have two 20mm cubes, A is on the front and B is on the back of the built plate. Lets assume that Process1 for A. Leave that one alone.
On Process2 for B, you can insert on your starting script G1 X10 Y5 ( Y5 can be Y100 if you want head further back) and M0 on a new line. This will have the same effect.
NOTES:
remember that you cant have all the usual stuff on the starting script such as bed level, home axis etc, because it may crash into model A in the bed.
And also make sure the processes are sequential (of course since you asked for this)